ACER position on the draft methodology for the electricity cost-benefit analysis
ACER has issued a position on the draft methodology for the electricity cost-benefit analysis (CBA) for projects of common interest and for the preparation of the Ten Year Network Development Plan (TYNDP) by ENTSO-E on the investments required in electricity transmission systems at European level.
ACER cooperates with ENTSO-E, the European Commission and the FP7-financed project THINK consortium to identify concrete proposals for achieving such improvements.